Early Production Facility (EPF) K01 Sarir Field
Description:
|
Supply of Equipment and Material for New Satellite Stations at Sarir GC-2 and GC-4
|
Client:
|
Arabian Gulf Oil Company of Libya (AGOCO)
|
Year:
|
2009
|
Project Scope:
|
Designing, Engineering, Procurement of material, Fabrication and transfer of goods to the client's site, pre-commissioning/commissioning of new oil-field equipment.
|
Design, Engineering, Supply of Material, Fabrication and Coating of:
- One (1) Horizontal Test Separator (10,000 BPD)
- Manifolds for GC-2 Satellites: Eight (8) fully assembled, 6-Slot Skid mounted Manual Manifolds
- Manifolds for GC-4 Satellites: Four (4) fully assembled, 6-Slot, skid mounted Manual Manifolds
- Instrument Air Package for GC-Satellite: One (1) instrument Air package, consisting of an Air Compressor (Capacity of 25 SCFM)
- Chemical Injection Skid for GC-2 Satellite: Two (2) Chemical Injection skids
- Chemical Injection Skids for GC-4 Satellites: One (1) Chemical Injection skid
- Launcher/Receiver skid mounted Package: One (1) 16" x 12" (NPS) Scraper launcher and one (1) 16" x 12" (NPS) Scraper receiver
Contact Us
If you have any additional questions, please feel free to contact our team. Our response time is usually within 24-48 hours.
Questions? Contact Us
Website version 20.12.22
Copyright © 2001-2024 Canadian Petroleum Processing Equipment Inc. (CPPE)
All rights reserved, unless otherwise noted.