Early Production Facility (EPF) NC-100 HAMADA

Description: Development of Early Production Facility (EPF) for GOSP-S & Satellites 'C', 'L' and 'Q', NC-100 HAMADA
Client: Arabian Gulf Oil Company of Libya (AGOCO)
Year: 2013
Project Scope: Designing, Engineering, Procurement of material, Fabrication and transfer of goods to the client's site, pre-commissioning/commissioning of new oil-field development in Hamada, Libya (Capacity: 25,000 BPSD).

Equipment Designed, Fabricated, Integrated and Supplied:

  • Four (4) six-slots Manifolds
  • One (1) First-Stage, Three-phase Separator
  • One (1) Second-Stage, Three-Phase Separator
  • One (1) Degassing Boot
  • Oil Storage Tanks
  • Dehydrator
  • Centrifugal Shipping Pumps
  • Centrifugal Booster Pumps
  • Oil Heater/Treater
  • Fiscal Metering Station
  • One (1) Chemical Injection Skid
  • One (1) Instrument Air System with Air Compressor
  • PIG Launcher & Receiver
  • H.P. and L.P. Flare System
  • Bolted Water Storage Tank
  • Diesel Generator
  • Gas Generator
  • Fire Fighting System
  • Distributed Control System (SCADA)
  • Control Buildings
  • Electrical Switching room
  • Motor Control Centre
  • Electrical Distribution System & Cabling
  • Fire Protection Systems
  • Electrical yard lighting and control systems
  • All related interconnecting items
  • Two years recommended spare parts

Contact Us

If you have any additional questions, please feel free to contact our team. Our response time is usually within 24-48 hours.

Questions? Contact Us