Early Production Facility (EPF) NC-100 HAMADA
Description:
|
Development of Early Production Facility (EPF) for GOSP-S & Satellites 'C', 'L' and 'Q', NC-100 HAMADA
|
Client:
|
Arabian Gulf Oil Company of Libya (AGOCO)
|
Year:
|
2013
|
Project Scope:
|
Designing, Engineering, Procurement of material, Fabrication and transfer of goods to the client's site, pre-commissioning/commissioning of new oil-field development in Hamada, Libya (Capacity: 25,000 BPSD).
|
Equipment Designed, Fabricated, Integrated and Supplied:
- Four (4) six-slots Manifolds
- One (1) First-Stage, Three-phase Separator
- One (1) Second-Stage, Three-Phase Separator
- One (1) Degassing Boot
- Oil Storage Tanks
- Dehydrator
- Centrifugal Shipping Pumps
- Centrifugal Booster Pumps
- Oil Heater/Treater
- Fiscal Metering Station
- One (1) Chemical Injection Skid
- One (1) Instrument Air System with Air Compressor
- PIG Launcher & Receiver
- H.P. and L.P. Flare System
- Bolted Water Storage Tank
- Diesel Generator
- Gas Generator
- Fire Fighting System
- Distributed Control System (SCADA)
- Control Buildings
- Electrical Switching room
- Motor Control Centre
- Electrical Distribution System & Cabling
- Fire Protection Systems
- Electrical yard lighting and control systems
- All related interconnecting items
- Two years recommended spare parts
Contact Us
If you have any additional questions, please feel free to contact our team. Our response time is usually within 24-48 hours.
Questions? Contact Us
Website version 20.12.22
Copyright © 2001-2024 Canadian Petroleum Processing Equipment Inc. (CPPE)
All rights reserved, unless otherwise noted.